SAIL STRAIGHT
INTO THE STORM
← Back to the world

NarrativeObject / narrative

The flood-control gate

A decision becomes a wall across the water.

Blender v47 context study. Gate and berth are preserved in v49.
Source depiction

Keep following the thread.

Original record and sources

A decision becomes a wall across the water.

The eastern canal contains a movable barrier with guide rails, hydraulic hardware and a maintenance berth. Its open and closed states are built into the model.

The gate turns a decision about the city into a physical boundary. Its maintenance berth connects the machinery above the water to the drone working below it.

Canonical identifier
urn:storm:object:flood-control-gate-016
Canon state / reality mode
working-canon / fictional
Source meaning
This record describes documented model geometry or supplied story context; it is not evidence of a real city or tested engineering performance. Production context: The physical gate is related to the story’s questions of authorization and local stop authority. It is not automatically the later treatment’s Gate 17, and the geometry is not a certified hydraulic design.

Open MP3 · Download MP3